The Rockwall Canyon Railroad

Assorted Photos: (thumbnails)

 

 

         

All images are thumbnails (click to enlarge)

 

           

 

      

All images are thumbnails (click to enlarge)

 

dcp00058.jpg      dcp000583.jpg      dcp000584.jpg  

 

    dcp000585.jpg

All images are thumbnails (click to enlarge)       
dcp000581.jpg   dcp000582.jpg      

 

          


 

 

Before and After shots:

 

dcp000588.jpg   dcp000588.jpg

            (1998)                        (2004)

 

The helical trestle was installed in this region (summer 2000) to eliminate a treacherous 6-8% grade further up the track. In the process, an elevated reverse loop (where the freight train is parked) was also added to provide additional operating routes. The original plastic trestle (on left) was replaced with a home-

made aluminum trestle. The grade is now 4% max.

 

 

 

 

...on to page 2